Daily progress capture
Fixed-track flight over the active site. Photogrammetric record stored against the project schedule.
Daily progress, AI change detection, as-built records before burial, after-hours theft prevention. Purpose-built for construction.
Daily progress orthos, volumetric tracking, safety compliance audits. Delivered across sites without supervisor mobilization. ISO 19650 BIM-aligned.
A single node delivers daily orthomosaics and panoramas, AI change detection between flights, and after-hours intrusion watch. As-built records are captured before burial. That gives you defensible documentation of underground drainage, conduit, and structural layouts. Schedule slip surfaces in days, not weeks.
Fixed-track flight over the active site. Photogrammetric record stored against the project schedule.
Cut/fill survey across active earthworks. Tonnage report against design surface.
Close-range inspection of facade panels, glazing, and cladding fixings.
High-work documentation that would otherwise need rope-access or boom lift.
Continuous monitoring of site fence, exclusion zones, and crane lift zones.
Photogrammetric as-built compared against BIM model. Deviation map produced.
Post-rain verification of BMPs, silt fence integrity, and erosion control across the disturbed footprint. Evidence pack timestamped against the rainfall event.
Annotated panorama and zone-state pack distributed to off-site subcontractors and design team. Trades arrive informed of yesterday's conditions.
Fleet-level narrative across every active site. Programme director sees one ROC view of progress, slip, and exceptions across the portfolio.
For construction sites within 10km of an Aerion node. Multi-customer node infrastructure. Standard progress, safety, and security cadence. Faster onboarding.
Dedicated node for mega-project sites requiring daily orthos, BIM-deviation flights, and round-the-clock theft deterrence. 8-12 week deployment.
Hi-vis, hard-hat, and harness detection across active work zones. Per-zone tolerance and per-trade exemption rules.
Person classification inside crane lift, blast, or live-utility exclusion zones. Real-time alert to site supervisor.
Earthworks, stockpile, and structural-element progress reported in cubic metres against the bill of quantities.
Photogrammetric as-built compared against the BIM model. Per-element deviation map produced after every flight.
Compares observed progress against the programme. Surfaces slippage in days, not weeks.
Person and vehicle detection on the site fence, gate, and material lay-down areas after working hours.
Crane, excavator, and tower-lift activity per shift. Idle time and bottlenecks visible to the planner.
Crane sweep area cleared of persons and obstructions before each pour. Recorded against the lift permit.
Tartu, Estonia operates the EU's only fully-operational U-space regulatory sandbox. Aerion operates inside this framework. That compresses BVLOS approval cycles that take 12-24 months elsewhere in Europe to weeks for our customers.
We're accepting design partners and pilot customers for 2026-2027 deployments. Tell us about your facility, fleet, corridor, or operation.
Request a site assessment