Component yard scan
Daily count and visual condition check of blades, nacelles, towers, and transition pieces in staging. Theft, damage, and misplacement flagged within hours, not weeks.
Estonia is becoming the Baltic Sea's offshore-wind staging hub. Aerion's Paldiski node sits next to the OSW construction quay, delivering continuous component-yard oversight, vessel-loading documentation, and post-installation asset support, all without the helicopter cost line.
Daily yard scan of blades, nacelles, and towers. Loading-op orthomosaics for insurance and dispute resolution. Quayside structural inspection. Quarterly thermal of stored components. Audit-ready EU records.
A single 13-15 MW turbine blade is 100+ m of carbon-glass composite worth €1-2M. A staged set of components for one Baltic OSW project is hundreds of millions of euros sitting on a quay for weeks at a time. Aerion's Paldiski node delivers daily yard scans, weekly orthomosaics, loading-event documentation, and quayside structural inspection. That is the visibility OSW developers, EPC contractors, and insurers all need but rarely budget for.
Daily count and visual condition check of blades, nacelles, towers, and transition pieces in staging. Theft, damage, and misplacement flagged within hours, not weeks.
Weekly 3D capture of the staging area for stockpile volumetrics, layout-change detection, and stakeholder reporting. Delivered through the customer portal in standard GIS formats.
Orthomosaic before, during, and after every loading op. Insurance-grade evidence for damage claims, dispute resolution, and stowage verification.
Scheduled patrols of fence line and back-area. Person and vehicle classification with timestamped evidence. Thermal at night.
Live operator-tasked loiter during heavy lifts and component transfers. Exclusion-zone monitoring (workers under suspended load) with alert to lift supervisor. Requires Private Network tier for operator-tasked flight.
Thermal + visual of quay structure: concrete spalling, expansion-joint integrity, bollard tilt, fender-pad damage. Early warning of damage that costs millions to repair when missed.
Long-stored nacelles and transformers checked for moisture ingress, electrical-cabinet hot spots, lightning damage. Pre-installation condition baseline.
Wind, sea, and visibility observation feeding loading-op go/no-go calls. Combined with regional forecast to support marine-window planning.
For Port of Tallinn, EPC contractors, and OSW developers anchoring long-term Paldiski operations. Host the Aerion node at your quayside facility, get daytime priority, dedicated night-window coverage, and first-call dispatch. The Aerion lead product for OSW staging.
For high-tempo construction windows requiring operator-tasked loiter during heavy lifts, custom mission profiles, and sub-2-minute alarm response. Deployment 8-12 weeks. Dedicated drone, exclusive use.
AI counts blades, nacelles, towers, and transition pieces. Cross-references against project manifest. Flags missing, mis-stowed, or unbooked units.
Visual change detection across stored components: surface damage, lightning strike marks, transport-handling marks, packaging integrity.
Photogrammetric height and volume measurement of aggregate, ballast, and bulk material stockpiles. Tonnage reconciliation against weighbridge.
Before/after comparison of loading orthomosaics. Identifies missing fastenings, stowage anomalies, and dunnage discrepancies vs the planned stowage diagram.
Person and vehicle classification inside crane-lift exclusion zones. Real-time alert with thumbnail and last-known track. Lift supervisor notified within seconds.
Compares current quay condition against baseline: concrete cracks, bollard tilt, fender displacement, scour around piles. Surfaces deterioration trends before they become repair-grade damage.
Nacelle electrical-cabinet thermal anomalies, transformer hot spots, moisture-ingress signatures in stored components. Pre-installation health flagging.
GPS-timestamped, asset-linked records meeting EU industrial inspection regulations and marine cargo insurance evidentiary standards. Audit-ready by default.
Tartu, Estonia operates the EU's only fully-operational U-space regulatory sandbox. Aerion operates inside this framework, compressing BVLOS approval cycles that take 12-24 months elsewhere in Europe to weeks for our customers. LUC application is underway (target 2027 H2). Once granted, Aerion self-certifies mission profiles within privileges, removing per-mission authorization friction for OSW project tempo.
We're accepting design partners and pilot customers for 2026-2027 deployments. Tell us about your construction-port operation, project tempo, or O&M support requirement.
Request a site assessment